The contract has been concluded between "Khorasan renewable energies" as the employer and Atieh Gostar Sanabad Trading Company as the contractor for design and installation of a 2 MW solar power plant in Taybad (south of Khorasan).
This power plant posseses 3 phases (400 KW, 600 KW, 1 MW) and it is conected to the general electricity network.
Comments